Industrial, Warehouse & Light Manufacturing

Painted block elevations, loading docks, dock aprons and the concrete a forklift lives on.

Industrial property is where exterior cleaning is most obviously maintenance rather than presentation. Painted concrete block is the standard wall in Wayne County light-industrial stock, and its paint film is the waterproofing — once that is compromised the block absorbs water and the freeze-thaw cycle does the rest. Dock aprons take the heaviest wear of any concrete on any property type. And the whole site runs on a shift pattern that decides when anything can happen.

Painted block is easy to wreck

It is the most common industrial wall and the least forgiving. Pressure strips the paint, and stripped paint on block is not an appearance problem — it is the building drinking water it used to shed, then spalling. Anything vertical on an industrial building gets soft washed for that reason. The place this shows first is the elevation nearest the dock, because that is where the dirt is worst and where the temptation to turn the pressure up is greatest.

The dock apron and the dock itself

The apron takes trailer traffic, dolly wheels, hydraulic fluid, diesel drips and whatever leaks out of what is being shipped. It is also where the rust footprints are, from dock plates, bumpers and anything steel left standing. Rubber dock bumpers, the leveller pit, bollards and the door track all collect the same mix. This is degreaser-and-dwell work rather than pressure work, and it is the concrete most worth doing on an industrial site because it is the concrete taking the most abuse.

Shifts, and everything that is live

A running plant has constraints an office does not: shift changes, trailers arriving on a schedule that is not yours, live electrical and compressed-air runs on outside walls, dust collectors, product moving through open dock doors, and a real reason nobody wants water anywhere near an open door. All of that means the pre-work walk matters more here than anywhere else, and it means work often lands between shifts or at a weekend.

The evidence for this one

Their own photographs include a painted concrete-block industrial elevation with a steel roll-up loading dock door, shot mid-wash with the clean stripe running down the dirty wall, and again finished — bollards, hard-hat-area signage and their rig on the truck bed all in frame. This is the vertical with the clearest photographic record behind it.

Text a photo, get a straight answer

The fastest way to get a useful answer on a commercial property is a photograph of the problem. Send one and Chris can usually tell you what it is, whether it needs pressure or chemistry, and whether it is worth doing before anybody visits.

Free on-site quotes · Quotes scheduled around your business hours · Canton, MI

Typical scope

  • Painted block and metal panel elevations, soft washed
  • Loading dock aprons, levellers, pits and bumpers
  • Roll-up door faces, tracks and surrounds
  • Bollards, guard rails and equipment pads
  • Rust footprints from dock plates and steel storage
  • Employee entrance, walkway and smoking area
  • Dumpster and compactor pads
  • Gutter runs and downspout discharge

Sensible interval. Dock aprons annually or twice a year under heavy traffic. Elevations every two to three seasons. Spring for the salt.

Questions

Can you work between shifts or at a weekend?

Yes, and on a running plant that is normally how it has to go. Say what your shift pattern is and where the trailers land and the work gets sequenced into it.

Our block is painted and the last contractor took paint off. What is different?

Method. Painted block gets soft washed — the solution does the work at low pressure and the wall is rinsed rather than blasted. Pressure on painted block is what took the paint off, and the resulting bare block is a water-absorption problem rather than a cosmetic one.

Will hydraulic fluid and diesel come off the apron?

They lift with a degreaser and dwell time rather than pressure. Fresh stains come out well; stains soaked into old porous concrete lighten substantially rather than disappear. Point out the worst of them at the walk-through and get the realistic answer before the work.

What about water near open dock doors and live electrical?

That is exactly what the pre-work walk is for. Where the panels, conduit, air lines and dust collection run, and which doors have to stay open, changes the sequence and sometimes the method.

Get a quote for your industrial & warehouse

Call or text (734) 883-0972. Quoted off a walk of the property, with a written scope.

(734) 883-0972
Call Text us